Balfour Beatty: Summit Tunnel Track Renewal

sector

Transportation

project type

Adaptation

location

United Kingdom

Situation

  • Balfour Beatty subcontracted ISS Labour Ltd to replace the troughing route on the Summit Tunnel in Todmorden, Yorkshire with cable hangers.

  • The cable hangers needed to be fitted to the tunnel wall at 1m intervals with the bottom bracket installed at rail height.

Solution

  • Pegasus Cable Hangers were chosen because they offered a high quality, non-corrosive, lightweight & modular solution.

  • The modular 4 way hanger offered a combination of 100mm hooks and a control style bottom hook which matched the project requirements perfectly.

  • 1200 units were supplied within a limited timeframe to suit the track access timetable.

Ellis Holding Power Logo
Ellis Holding Power BSI

Ellis Patents Ltd.
High Street,
Rillington, Malton,
North Yorkshire YO17 8LA
United Kingdom

Company registration number: 10293983

Registered in England and Wales

VAT number: GB125424145

© Ellis Patents 2025 Terms and Conditions Cookie Policy Sitemap

Website by Askew/Brook